# Establishing the APM Committee

**URL:** <https://research.lido.fi/t/establishing-the-apm-committee/9998>\
**Category:** Proposals\
**Created:** [May 2, 2025, 9:15am UTC](https://research.lido.fi/t/establishing-the-apm-committee/9998 "2025-05-02T09:15:49Z")\
**Posts on this page:** 1\
**Showing post:** 21

<div class="post-metadata">

**Author:** ![Gabriella\_S](https://dub1.discourse-cdn.com/flex013/user_avatar/research.lido.fi/gabriella_s/32/5515_2.png) [@Gabriella\_S](https://research.lido.fi/u/Gabriella_S)\
**Post date:** [February 27, 2026, 12:53pm UTC](https://research.lido.fi/t/establishing-the-apm-committee/9998/21 "2026-02-27T12:53:26Z")

</div>

### mev-commit (Primev) Testing Results

We’ve concluded the mev-commit testing phase, as described in the APM Decision.  
Over the past weeks, Lido validators opted into Primev’s mev-commit network on the Hoodi testnet. Below is a concise summary of the most relevant findings from (1) Primev’s published results and (2) our internal performance analysis.

* * *

**Key Results**  
During the Hoodi testnet phase, ~16,000 Lido validators opted into Primev’s mev-commit network across 8 operators. Adoption came in waves, with a large batch (~10k validators) onboarded in early December.

_Primev-reported metrics (shared with Lido team):_

- 0 slashing events
- 0.53% missed proposal rate (8/1,506 blocks)
- 98.5% active-online rate
- 93.8% clean-day rate

_Lido internal analysis confirms:_

- ~99.84% average uptime across clusters
- 98.9–100% proposal success per operator
- 99.55% overall proposal success
- No operator-specific degradation linked to mev-commit

Even under elevated testnet missed-slot conditions, Lido clusters maintained strong proposer performance.

**Overall Assessment**  
Combining Primev’s reported metrics with our internal validation:

- No slashing observed
- Missed proposals remain extremely low
- Uptime and attestation performance remain within normal ranges
- No cluster-specific performance degradation
- Rewards distribution successfully tested

Under Hoodi testnet conditions, mev-commit integration appears **operationally stable and technically compatible with Lido’s validator set**.  
Further mainnet validation would be required to assess long-term revenue impact and latency sensitivity under real economic load, but the testing phase does not surface material technical blockers.  
Thus, I am recommending the inclusion in the [APM Allow List](https://github.com/lidofinance/documents-and-policies/blob/main/APMs%20Allowed%20List.md).

---

_[View the full topic](https://research.lido.fi/t/establishing-the-apm-committee/9998)._
