Lido on Ethereum RockLogic Weekly News Post
“Making things better by the week”
Third Update 17.05.2023
INTRODUCTION
This is a new format that Lido DAO contributors and RockLogic set up to communicate in a more transparent manner with the Ethereum blockchain community.
What happened in the past 3 weeks:
ETHEREUM NETWORK ISSUES
We analyzed the impact of Ethereum network issues from the 11th and 12th of May, 2023 related to a Prysm bug on our infrastructure.
FALLBACK FULL NODES FOR VALIDATOR CLIENTS
We moved additional keys to validator client failover infrastructure, making it 3 300 keys on multiple Lighthouse, Nimbus & Teku validator clients.
Our investigation of the Teku consensus client port forwarding issue is still ongoing.
LIDO V2 COMPLIANCE
Regarding the Lido V2 mainnet launch no erros occurred.
A dry run was turned off successfully. Confirmed for V2 mainnet ready are:
- Multiple access nodes for EJECTOR and KAPI up and running
- EJECTOR up and running in LIVE mode (dry_run = false)
- KAPI up and running
- 500 exit messages pre-signed
In addition, outdated KAPI docs and issues with Nimbus were reported to the Lido tooling team.